Sign In | Join Free | My carsrow.com |
|
Brand Name : Greentech
Model Number : 3524
Certification : SGS
Place of Origin : Tianjin,China
MOQ : 500kg
Price : $2.6-5.8/kg
Supply Ability : 1000 tons per month
Packaging Details : 20kg/carton
Raw Material : Epoxy Polyester Hybird resin
Color : Ral color
usage : indoor
Gel time : 250±50
Application Method : Electrostatic spray
Gloss : high/Low/Matt
electrostatic epoxy polyester resin powder coating
Feature:
Item | Test standard and method | Test | ||
Appearance | Color uniform, loose without blocking, dry coating liquidity 120—140mm | visual | ||
color | As customer required | Chromatic meter | ||
Adhesion | GB/T9286-1998 | ISO2409 | 0 class | |
Impact resistance | GB/T1732-1993 | ISO6272 | 50kg.cm | |
flexibility | GB/6742-1986 | ISO1519 | 3mm | |
Cupping test | GB/T9753-1993 | ISO1520 | 8mm | |
Pencil hardness | GB/T6739-1996 | ASTM/D3363 | 1H-2H | |
Salt spray testing | GB/T1771-1991 | ISO7253 | > 500hour | |
Heat resistance | 150℃/24 hours(white) | <0.5 | ||
Humid and hot resistance | GB/T1740-1979 | ISO6270 | >1000hous | |
Application areas: air conditioning, refrigerator, microwave ovens, cooking hoods electric kettles and other household appliances shell
![]() |
Interior / Patio Furniture Powder Coating 250±50 Gel Time Impact Resistant Images |